As soon as people start thinking about building a new two storey house one of the first questions that comes up usually is something like: How long does it take to build a two story house in Perth?

As a general rule of thumb, it takes about 18-24 months to build a two story house in Perth. However, this time period is not fixed and can vary depending on the size of the house, its complexity and other factors.

Before we go into more details of ‘how long’, let’s first start with what needs to happen before you start building, what the steps are to build a house and what materials are needed. This will help us to get a better idea of ‘how long does it take’.

What are some of the things that need to be done before you start building a two storey house in Perth?

You will need to make sure you have the necessary funds to cover the costs of building a two storey house. You should also decide on the size and design of your new home.

The next step is to find a suitable location for your new home. You will need to take into account things like accessibility, building restrictions and environmental factors.

Once you have found a location, you will need to get the necessary approvals from local authorities before proceeding with the construction of your new home. Your builder will usually take care of this for you.

As you can see, all of this pre-planning already can take a long time to be finalised before you even get to the point of starting the construction process of your new 2 storey home.

What are the steps of building a 2 storey house?

Building a 2 storey house is an important and time-consuming process. There are many steps that need to be taken before the house is finally completed. This is also why some people start questioning wether or not it's better to build a double or single storey home.

The first step of building a house is to find a suitable lot to build on. The lot should have an appropriate size and location for the type of home desired. It must also be within budget and in a location which will suit the needs of the person(s) who will live there.

Depending on if you are using a project home builder or are sub-contracting the various elements of the build yourself, the following steps will differ.

If you are doing it yourself, the next step is to bring in construction workers, architects, designers, contractors, builders and engineers who will work together as a team to design and build the home. They need to agree on what materials will be used for construction and how the home will be laid out. They need to design the exterior, floor plan and interior of the home before construction begins.

If you are using a project home builder, they will handle all of these steps on your behalf.

The overall process can be broken down into 4 steps:

  1. Finding a vacant block in the desired location
  2. Designing the house
  3. The construction process
  4. Finishing items - landscaping, flooring, painting etc

Back to our question: How long does it take to build a two story house Perth?

Knowing what steps are involved in building a house as well as the materials needed you get a better idea how long it takes to build a 2 storey house in Perth.

A two-story house in Perth can generally be built in about 18-24 months, but this will depend on the size and complexity of the house.

The time taken to build a two-story house in Perth will depend on a number of factors including:

- The size and complexity of the house

- If you engage an architect or go with a pre-designed home via a project home builder

- The number of tradespeople working on site

- The weather conditions during construction

- The availability of construction materials

- Labour shortages (like we have experienced after the COVID 19 pandemic)

Final question: What is the cost for building a two story house in Perth?

With all the information above it is obvious that building a two storey house in Perth is not a simple and straightforward process.

The costs can vary greatly and there are a range of factors that influence not only how long it takes to build a 2 storey house but also how much it will cost to build it. For more details on wether it's cheaper to build a double storey house please read this article.

The cost of building a two story house in Perth will depend largely on the size, features and location of the property.

The average price for building a two story house in Perth is around $1700 to $2,500 per square metre. This means that if you want to build a two story house with an area of 300 square metres, then you can expect to pay around $510,000 to $750,000.